
Manufacturing group cuts infra cost 32% with Azure migration
Aging on-prem servers, rising CapEx, DR gaps and a 12-hour RTO with no tested runbooks.
Designed an Azure landing zone, executed a phased lift-and-shift, deployed Site Recovery + Azure Backup, and rolled out cost-governance policies with tag-based budgets.
32% infrastructure cost reduction, RTO from 12h down to 45 minutes, zero-downtime cutover.
"Prime Fixel migrated our on-prem workloads to Azure with zero downtime. The FinOps controls kept us honest."



